ZRO (Base) vs FRAX (Avalanche) — every figure is the freshest dated measurement we hold for that token, never a live-feed guess. Prices stamped 2026-09-26 / 2026-09-27.
| ZRO | FRAX | |
|---|---|---|
| Price | $1.63 | $0.9996 |
| Market cap | $436.89M | $219.23M |
| 24h volume | $911.98K | $27.77K |
| Liquidity | $291.89K | $128.59K |
| FDV | $7.53M | $620.92K |
| Holders | 448,942 | 10,091 |
| Age (days) | 158 | 1,399 |
| Safety grade | A | C |
ZRO at 0x6985884c4392d348587b19cb9eaaf157f13271cd — LayerZero — is the Base deployment, 158 days into its record at the September 26, 2026 snapshot and carrying a byte-identical address to the Optimism one — the same omnichain contract deployed deterministically on each chain. The asset-wide $436.9 million market cap towers over the $7.5 million fully-diluted figure on 6.1 million local units.
The local book is thin for the headline but the tape is the liveliest of the ZRO books: $291.9 thousand of tracked depth on $912.0 thousand of 24-hour volume — turnover three times the pool daily. Contract-level controls were not assessed in this snapshot.
FRAX at 0xd24c2ad096400b6fbcd2ad8b24e7acbc21a1da64 is the Avalanche deployment of Frax's dollar token, 1,399 days into its record at the September 27, 2026 snapshot. The asset-wide $219.2 million market cap dwarfs a $620.9 thousand fully-diluted figure priced on 621.1 thousand local units.
The local book is thin and the tape quiet: $128.6 thousand of tracked depth on $9.6 thousand of 24-hour volume — a held slice. Contract-level controls were not assessed in this snapshot.
By tracked market cap: ZRO (Base) measures $436.89M and FRAX (Avalanche) measures $219.23M — dated snapshots, not a live feed.
On the contract checks we publish: ZRO (Base) grades A and FRAX (Avalanche) grades C. A grade is a structural check on the contract, not a promise about the asset.
Between 2026-09-21 and 2026-09-26T18:07:24, the measured snapshots show ZRO at +31.8% and FRAX at −11.7%.
MIL vs ZROGRASS vs ZROZRO vs USAPURPE vs ZROALTSZN vs FRAXFRAX vs RFCEVAA vs FRAXKET vs FRAX
The grade column is the one CMC's compare page cannot print — our grade is computed from the contract itself (mint/freeze authority, liquidity, holder concentration). Changes are measured over the shared window stated on the chart, 2026-09-21→2026-09-26T18:07:24; a token with fewer measured points measures a shorter span inside it.
Figures are dated on-chain snapshots, not a live feed. Safety grades are structural checks — not investment advice. Free · no signup · a NexFlow product.